Book a Tour Today!
break
Dakotarod Trail break

Helen Keller
Homepage  >  Teacher's Toolbox  >  Dakotarod Trail

Dakotarod Trail
Iditarod Trail
Your students are on the committee to plan the first Dakotarod Trail across South Dakota. Use a South Dakota map to make a Dakotarod Trail.

Reminder:
  • Map the trail on a sheet of paper.
  • Twenty-six check points are needed.
  • Check points should coincide with cities.
  • City locations should be realistic.
  • The Dakotarod should be as close to 1,049 miles long as possible.
  • Design colorful covers for individual Iditarod scrapbooks.
  • Rivers must be crossed at bridges.
  • Don't follow too close to highways - dogs will be frightened.
  • Lakes may be crossed if they are frozen.
  • Stay within the South Dakota borders.
  • The same city may not be visited twice.
  • Note the average distance a dog sled team can travel.

For more information about any of these projects, contact:

Barb Barraclough
Williams Middle School
1425 Cedar Street
Sturgis, SD 57785
(605) 347-5232
meadems@meade.k12.sd.us




Summer Kennel Tours Mushing Adventure Camps Winter Treks and Tours Dream Inn Bed and Breakfast